Factory for rent in Ba Ria Vung Tau - GPLease Vietnam Industrial Trading

  • Area:  60000m2
Contact Us

Ready-built factory for rent in Chau Duc, Ba Ria Vung Tau

For Rent
  • Lot 40,Sonadezi Chau Duc Industrial and Urban park, Chau Duc district, BR-VT

Ready built factory located in Chau Duc, Ba Ria Vung Tau.

Property Name: VT-L-01
Property Type: Warehouse or Factory
Location: Lot 40,Sonadezi Chau Duc Industrial and Urban park, Chau Duc district, BR-VT
Driving time to CBD: 16-19 km to Caimep/Phumy port, 60km to Catlai port, 75km to Tan Son Nhat IA, 54 km to Long Thanh IA (Executing)
Land Area: 100.000 m2
Unit size: from 2.400 to 8.000 m2
Total Lettable Area: 60.000 m2
Year Completed: Q4 2021
Clear Height: 12m
Information about the property and its availability are subject to change without notice.

Overview

Chau Duc Industrial Park – Ba Ria Vung Tau

Overview of Chau Duc Industrial Park, Ba Ria Vung Tau Province

Chau Duc Industrial Park is located in two communes, Nghia Thanh and Suoi Nghe, Chau Duc district, invested by Sonadezi Chau Duc Joint Stock Company, built in 2007 with a scale of 2,287 hectares. Chau Duc has been completing the technical infrastructure, in parallel, many factories in the industrial park are being completed quickly by the investor to meet the demand for renting factories in Chau Duc Industrial Park in particular and demand for renting factories in Ba Ria – Vung Tau province in general

As a bright spot in attracting investment in Ba Ria-Vung Tau, Chau Duc Urban Industrial Park is expected to attract about 80,000 employees, including about 10,000 local workers, and strive to achieve the ratio by 2020. The occupancy rate at the industrial park is 50%, thereby, Chau Duc Urban Industrial Park is expected to become the focus of investment attraction in the near future, creating a push to promote the economic and social development of Ba Ria – Vung Tau province. Ria-Vung Tau as well as the key economic region in the South.

Location and planning of Chau Duc Industrial Park – Ba Ria Vung Tau

As one of the large complex industrial parks of the country with a total area of ​​2,287 hectares, including 1,556 hectares of industrial land for lease, 689 hectares of Chau Duc Urban Area & Golf Course and 42 hectares of outdoor land. The urban area is planned to be built synchronously with a full range of functional areas and utility services, the location is extremely convenient in terms of traffic, about 6km from National Highway 56, nearly 13km from National Highway 51, from Thi port. Fabric 16km, 19km from Cai Mep port and 21km from Go Dau port, near the important traffic axis in terms of road and seaport, Chau Duc Urban Industrial Park not only meets production requirements, saves cost and time goods transportation for domestic and foreign investors but also serve the daily living requirements for workers working inside and outside the industrial zone.

Technical infrastructure in Chau Duc Urban Industrial Park is modernly and synchronously invested with the North-South central trunk road consisting of six lanes with a separation of 2m and a road width of 54m, branch roads with two lanes and a highway. 29m

The North-South central trunk road of the area consists of 06 lanes, a median strip of 02 m, and a road width of 54 m. Branch roads have 02 lanes, width of 29m.

Geological:

Soil layer with depth from 1 to 3.5m: 9.31 tons/m²²

Soil layer with depth from 3.5 to 6.5m: 16.33 tons/m²²

Soil layer with depth from 6.5 to 12m: 31.68 tons/m²

POWER SUPPLY SYSTEM

02 110/22KV transformer stations with capacity of 2 x 63 MVA each for power supply.

Electricity price: according to the provisions of the electricity price of the State of Vietnam for voltage level from 22KV to 110KV

The capacity of the clean water supply plant in phase I is 75,000 m³/day (in operation) and a maximum of about 150,000 m³/day in the future.

Water price is calculated according to current water unit price in Ba Ria Vung Tau province.

WASTE WATER TREATMENT SYSTEM: It is planned to invest in 03 centralized wastewater treatment plants with a total expected treatment capacity of about 45,000 m³/day.night

Wastewater to be treated: domestic wastewater and production wastewater

Charged wastewater volume is equal to 80% of supply water volume.

Factory for rent in Ba Ria Vung Tau

Factory for rent in Ba Ria Vung Tau

Infrastructure for internal roads in Chau Duc Industrial Park

The communication network, gas supply, electricity supply, clean water supply, waste water treatment, fire prevention and fighting are all fully arranged.

Preferential policy for investors when renting land in Chau Duc Industrial Park, Vung Tau

With outstanding investment incentives including the income tax rate of 17% for 10 years, and tax exemption for 2 years and 50% tax reduction for the next 4 years, Chau Duc Urban Industrial Park will welcome more Investors.

On the other hand, in order to create the best support for investors, Chau Duc Industrial Park has built many factories for lease to welcome investors with a workshop area of ​​1,600m2 or more, synchronous infrastructure. Industrial park technicians with rental rates from 4 USD/m2/month (excluding VAT)

Chau Duc Industrial Park is a typical, extremely prominent industrial park, with many advantages in terms of both geographical location and investment incentives and promises to be a promising land for investors in need. investment in Ba Ria – Vung Tau province.
Some main industries to encourage investment in Chau Duc Industrial Park – Vung Tau

With the motto that production must be associated with environmental protection in order to develop sustainably, Chau Duc Urban Industrial Park is built in the direction of prioritizing investment in developing modern, low-polluting industries such as: Assembling and manufacturing electronic components, computers and semiconductors; Telecommunications cables and materials; Pharmaceuticals, medical equipment; Precision mechanics, manufacturing air conditioners, washing machines; The processing industries of gold, silver, precious stones, diamonds and precious metals; Mechanical processing, steel structures; Assembling bicycles, motorbikes, cars and specialized means of transport; Processing agricultural products, agro-pharmaceuticals, food and beverages (not processing tapioca starch); …..and pay special attention to creating a green area for the Industrial Park by greening all internal traffic routes and the entire campus, this green area not only means to create shade but also create landscape,

Some typical investors in Phu My 3 Industrial Park

Chau Duc Ba Ria Vung Tau Industrial Park has attracted many foreign investors to lease land and build factories, such as: SONADEZI CHAU DUC, Aurelial (United Kingdom) PVCM, Makigan, Solar Farm (Korean) , Dejuvina, Sungjin (China),…

Cost of renting land and renting workshops in Phu My 3 Industrial Park – Ba Ria Vung Tau

– Ground rent: 70 usd/m2

– Management fee: 0.05usd/m2/month (maintenance, maintenance, security protection …)

– Waste water treatment fee: 0.4 usd/m3

Preferential policy for investors when renting land in Chau Duc Industrial Park, Vung Tau

With outstanding investment incentives including the income tax rate of 17% for 10 years, and tax exemption for 2 years and 50% tax reduction for the next 4 years, Chau Duc Urban Industrial Park will welcome more Investors.

On the other hand, in order to create the best support for investors, Chau Duc Industrial Park has built many factories for lease to welcome investors with a workshop area of ​​1,600m2 or more, synchronous infrastructure. Industrial park technicians with rental rates from 4 USD/m2/month (excluding VAT) Factory for rent in Ba Ria Vung Tau

Chau Duc Industrial Park is a typical, extremely prominent industrial park, with many advantages in terms of both geographical location and investment incentives and promises to be a promising land for investors in need. investment in Ba Ria – Vung Tau province.

Please contact Kland for legal advice on land rent, preferential policies, procedures for applying for investment certificates, business registration for investors.

Details of Chau Duc Industrial Park – Ba Ria Vung Tau

  • Name: Chau Duc Industrial Park – Ba Ria Vung Tau
  • Investor: SONADEZI CHAU DUC CORPORATION
  • Code: CHAUDUC-IP-VT – Operating time : 2058
  • Address: Nghia Thanh commune, Suoi Nghe, Chau Duc district, Ba Ria – Vung Tau province, Vietnam
  • Total area: 2287ha
  • Workshop area: 1600m² Land: Minimum land plot:10,000 m2 Factory: Built up area:1,600m2
  • Construction density (%): 60 (%)
  • Price: 55 USD/m2 Not including VAT, management fee, insurance, electricity and water

Our services:

Through many years of working experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, we provide the following services:
• Investment promotion (land, factory) in industrial parks, industrial clusters and enterprise land
• Legal support & Investment consulting in fields related to industrial real estate
• Connecting Industrial real estate investment cooperation. Factory for rent in Ba Ria Vung Tau

Contact:

Vietnam Industrial Park Investment Promotion Joint Stock Company

Phone: 0822246444
Email: Info@dvhgroupvn.com

Web : https://gpleasevn.com/

Note:

tax exemption for 2 years and 50% reduction of tax payable for the next 4 years.

Categories Detail
OVERVIEW:
Infrastructure investors SONADEZI CHAU DUC JOINT STOCK COMPANY
Place Nghia Thanh Commune, Suoi Nghe, Chau Duc District, Ba Ria – Vung Tau Province, Vietnam
Acreage total area 2287 hectares
Factory land area 1556 hectares
Space available 500 hectares
The percentage of trees
Operating time 2008
Current Investor 36 Investors: SONADEZI CHAU DUC, Aurelial, PVCM, Makigan, Solar Farm, Dejuvina, Sungjin
Main job Electronic components, cables, telecommunications, electrical equipment, auto accessories, nanotechnology, gems, mechanics…, High technology
Occupancy 50%
LOCATION & DISTANCE:
Road Distance from HCMC: 75km; Vungtau city:44km National Highway 56
Air Longthanh Airport: 54km; Tan San Nhat International Airport: 70km
Train yes
Seaport Thi Vai seaport: 16km; Caimep 19km
INFRASTRUCTURE:
Geological Sandy soil, K = 0.9
Internal traffic Main road Width:54m, Number of lanes: 4 lanes
Side branch road Width: 29 m, Number of lanes: 2 lanes
Electricity supply Voltage Power line: 110/220/500KV
Power capacity 2x63MVA
Clean water Wattage 75,000m3/day
Highest capacity
Waste water treatment system Wattage 45,000m3/day
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE:
Land Land rents 50-70 USD
Lease term 2058
Type/Grade Level A
Payment methods yearly/ single payment
Deposit 6 months
Minimum area first
Workshop 3-5 USD
Management fee Management fee 0.5USD/m2
Payment methods 12 months
Electricity price Peak 0.1 USD
Normal 0.05 USD
Idle 0.03 USD
Payment methods Monthly
Supplier EVN
Clean water price nước Water price 0.4 USD/m3
Payment methods Monthly
Water supplier Charged by Gov. suppliers
Wastewater fee Price $0.28/m3
Payment methods Monthly
Water quality before treatment Level FUCK

Address

Related Real Estate