Factory for rent in Hue Vietnam - Factory for rent H-GP01

  • Area:  8990m2
Contact Us

Factory for rent H-GP01

For Rent
  • Chan May West Port, Phu Loc District, Thua Thien Hue Province
Property Name: Factory for rent H-GP01
Property Type: Ready-built Factory For Rent
Location: Chan May Industrial Park – Lang Co, Thua Thien Hue.
Driving time to CBD: 60 km from Hue city center
45 km from Phu Bai International Airport
35 km from Da Nang city
Unit size:   Factory with office:
– Office area: 600 m2
– Factory area: 4,599 m2
– Land area: 8,990 m2
Total Lettable Area: 8990m2
Year Completed: The workshop is under construction and completion
Clear Height: 6.5m – 13m
Furnishing condition: + Fire fighting system (water sprinkler system and hose reels, hydrants and smoke detectors)
Information about the property and its availability are subject to change without notice.

– Factory rent: 3 USD/m2/month, factory transfer: 200 USD/m2 (excluding VAT)
– Office rent: 5 USD/m2/month, Office transfer: 250 USD/m2 (VAT excluded)
The factory will be handed over according to the agreement between the two parties
Corporate income tax incentives
Tax rate of 10% for 15 years, tax exemption for 4 years, 50% reduction of payable tax for the next 9 years

Overview

Chan May – Lang Co economic zone was established by the Prime Minister with an area of ​​27,108 hectares, of which the land area for construction of the economic zone is about 10,000 hectares, including: Lang Co town, Loc Thuy and Loc communes. Tien, Loc Vinh belong to Phu Loc district, Thua Thien Hue province. According to the planning orientation, Chan May Lang Co EZ is a general economic zone with modern infrastructure, the stature of a modern port urban area, the nucleus of marine economic growth; Southernmost developed province of Thua Thien Hue province

GEOGRAPHICAL LOCATION

The economic zone is located between the two major economic and cultural centers of the Central region, which is Ho Chi Minh City. Hue and City. Da Nang and the Central Key Economic Zone; 45km from Phu Bai International Airport, 35km from Da Nang City and Da Nang International Airport
Soil conditions: There are all kinds of terrain such as sea, coastal, lagoon, plain, hilly and mountain forest. The delta is relatively flat; The soil is mainly fine sand. The geology of the area is in the form of a local basin with mainly sand, shells, etc., the area is not located in the geological fault belt.
Altitude above sea level: 3-5 m
Climatic conditions: Temperature: the average annual temperature is 25.20C, the hottest month is July and the coldest month is December. Humidity: the average daily humidity ranges from 65-85%. Wind: located in the tropical monsoon region, there are two main wind directions: East – North monsoon in winter and West – South monsoon in summer. The average wind speed is 1.7 m/s.
Distance to the nearest big city:: 35 km from Da Nang city
Distance to Provincial Center: 60 km from Hue city center
Distance to nearest airport: 45 km . from Phu Bai International Airport
Distance to the nearest railway station : About 60 km from Hue station
Distance to nearest River Port: Data is being updated!
Distance to the nearest seaport: 35 km from Da Nang city
Factory for rent in Hue

Factory for rent in Hue

THE INFRASTRUCTURE

Transportation System
Internal traffic: The main traffic routes have been completed according to the general planning, detailed planning, more than 100 km of roads have been completed, meeting the traffic demand within the economic zone and the ability to connect with the city. Highway 1A and connecting to the area through Chan May port

Electricity

The power supply for the economic zone is the grid power system from the 500/220/110KV Da Nang power station. Currently, 03 110/22kV substations have been completed with a total capacity of 75 MVA and a distribution network, which is enough to supply electricity for production and daily life in Chan May and Lang Co areas.

Water

The water supply for the EZ is used from the Bo Ghe Water Supply Plant with a capacity of 8,000 m3/day, the water supply pipe system with a diameter of D100-450 with a total length of more than 20km is connected to functional areas. of the economic zone, meeting the water demand for production, business and daily life in the current period. The next phase is to invest in the construction of Loc Thuy Water Supply Plant with a capacity of 110,000 m3/day
Factory for rent in Hue

Factory for rent in Hue

Wastewater treatment

There is a Lang Co wastewater treatment plant with a capacity of 5,000 m3/day. Currently, the construction of phase 1 of the project No. 2 Wastewater Treatment Plant in Industrial Park and Non-Tariff Zone is underway with a capacity of 4,900 m3/day and night to treat wastewater for projects entering the area. industrial and non-tariff zones. Expected to be completed in 2018 to put into operation.
Process rubbish
Solid waste treatment plant with an area of ​​​​30 hectares in the East of Phuoc Tuong Pass
System of fire
Fire hydrants are installed along the main road and branch road

Communications

Switching system: Chan May area is currently using 2 Host-ERICSSON switchboards with 06 satellites. Total installed capacity 9216 Lines; Usage: 6605 Lines. Upgrading 2 switchboards to ALCATEL 1000E10MM with multimedia, multi-channel

Other information

Regarding social infrastructure: Infrastructure works such as hospitals, resettlement areas, tourist areas, hotels, restaurants, banks, post offices, markets and supermarkets have been built to meet the needs of social infrastructure. of workers and investors.

AREA & STATUS

Total planned area
27.2 (ha)
Area available for rent
8380 (ha)

• Non-tariff zone: 592 ha / • Port area (including water surface area): 631 ha / • Industrial zone: 385 ha / • Urban area: 3,441 ha / • Tourist area: 3,331 ha

Smallest rental area
0 (m2)
Occupancy
Data are being updated!
Factory for rent in Hue

Factory for rent in Hue

COST

Land lease
0.2 USD/m2

– Land with infrastructure investment: 22-30 USD/43 years. (Applicable at Saigon Chan May Industrial Park). – Raw land without infrastructure investment: from 0.02-0.2 USD/m2/year. (Price depends on function area)

Rent warehouse
USD/m2

Management fee

0.4 USD/m2/year
Electricity price
According to the general price of the State

Water price

For production: 11,081 VND/m3 For business – service: 15,610 VND/m3

Cost of wastewater treatment

– Standard: The treated water is grade B (according to QCVN 40:2011/BTNMT) – Fee: Under construction
Solid waste treatment fee
600,000 VND/ton

ENDOW

Corporate income tax incentives
Tax rate of 10% for 15 years, tax exemption for 4 years, 50% reduction of payable tax for the next 9 years
Import tax incentives
Investors are exempt from import tax on goods imported to create fixed assets of investment projects according to the provisions of the Law on Import Tax and Export Tax. Factory For Rent

VAT incentives

Other offers

Personal income tax: 50% reduction of personal income tax Land incentives: – Exemption from land rent and water surface rent for the entire lease term for investment projects on the list of special priority sectors investment incentives. – Exemption from land rent and water surface rent for fifteen (15) years for investment projects on the list of sectors eligible for investment incentives. – Exemption from land rent and water surface rent for eleven (11) years for other investment projects.

Address

Related Real Estate