Long khanh industrial park established in june 2008 according to decision no. 1783 / qd – peoples’ committee of the dong nai people’ s committee, chaired by the joint stock company of the rubber corporation of dong nai rubber corporation in vietnam rubber corporation.
Long khanh iz with a convenient geographical location, near the highway, port and airport, is a real attraction to investors, including a number of foreign enterprises such as dong myung vina ltd., co – ltd, ltd, ltd
Some major areas in the industrial zone:
Industrial toys manufacturing, physical training and physical training
Agricultural processing, food, food
Production of footwear, tinh; production of construction materials, interior decoration
Electronics and microelectronics
Framing, assembling, building motorbikes and parts
The geographic location of long khanh industrial park
A person who likes this content. Be the first of your friends
Long khanh industrial park is located in bamboo tre and binh loc commune, long khanh town, dong nai province. Highway 1a
the advantage of road traffic, waterways, railways and air, meet all requirements of investors on transportation
and transportation.
The center of bien hoa city: 40 km, ho chi minh city: 70 km
Tan son nhat airport: 80 km, long thanh international airport: 40 km
Cách ga: 4 km, giây: 8 km
Cảng oil: 60 km, cảng phú mỹ: 65 km, vung tau port: 60km
Long khanh industrial infrastructure
Power:
The electricity supply system shall be taken from tramh biến 110 / 22kv áp 120 / 22kv 120 mva by long khanh electricity
according to routes in the iz, ensuring sufficient supply for và được đầu nghiệp chân chân nhà nhà máy.
Water supply:
Long khanh water supply company is responsible for supplying clean water to the entire factory in the industrial park with
8000m3 / day capacity
Communications:
The communication and communication system in the iz shall be invested in the construction, fully and promptly by the ministry of nai
contact and domestic communications (landline, mobile, fax, internet, adsl …) with high speed lines, supply
for an iz about 1. 962 telephone numbers
Drainage system:
The water drainage pipeline is installed along the internal roads of industrial parks.
Centralized wastewater treatment plant with a capacity of 6400m3 / day.
Traffic:
The main axis of the road shall be located 4 lanes of lanes, the width of the 40 – foot road, the internal roads with the width of 20 – 41. 5m
30 – ton vehicle load.
Investment incentives in long khanh industrial park
Pursuant to decree 218 / 2013 / nd – cp dated december 26, 2013 on enterprise income tax. For two years and reduce the amount of tax payable
in the following 04 years, for the enterprise’ s income from the new investment project in the industrial park. Until day
01 / 01 / 2016 remaining 20%
Human resources, wages, expenses in long khanh industrial parks
A strong labor source with average wage for unskilled laborers is $ 170 per person / month, for skilled laborers
it’ s about $ 250 per person / month.
Expenses for management, electricity, water and wastewater treatment shall be calculated according to the state’ s regulations on dong nai city